industrial
Ref. PA-19426

Wapi Logistics Campus 21

Rue du Grand Vent
7600 Péruwelz

AvailabilityImmediate
SizeMin. 8.937 m² - Max. 109.753 m²

Description

A logistics site that meets all the criteria required by logisticians.
Planning permit will be applied for in 2023. The site will be built and operational in 2026.

Sustainability strategy: 

  - Solar energy

  - Optimizing the use of natural light

  - Cost-effective: reduced maintenance costs thanks to the use of high quality and performing materials

  - Reducing water usage: rainwater harvesting 

  - Recycled & recyclable materials

  - Charging stations

  - BREEAM methodology

Read more description

Technical description

  • Air conditioning
  • Clear height : Hall - 13,70 m
  • Clear height : Mezzanine - 4,70 m
  • Concrete plinth height : 2,50 m
  • Concrete polished floor
  • Concrete walls
  • Concrete construction
  • Construction date : 2024-2025
  • Electrical charging stations : option/optie
  • Electrical entrance for lorries : (4m x 6m) : 1/unit(é)
  • Exterior lighting
  • Fire alarm system
Read more

Location and Transport

The site is located 400 metres from the exit 29 'Péruwelz' of the E-42 motorway from Mons to Tournai and is situated (and visible) along the motorway.