industrial
Ref. PA-18165

Garocentre Terminal - Sud

Rue Mercure
7110 Houdeng-Goegnies

AvailabilityImmediate
SizeMin. 7,000 m² - Max. 60,382 m²

Description

Complex of logistics buildings to be built in compliance with the highest quality standards, on a site of 14 ha. The works have begun in November 2022.Direct trimodal access (water, rail, road).In this industrial zone, only logistic activities are accepted by IDEA, which is the intermunicipal manager of the zone.The tenant will be subject to approval by the relevant intermunicipal authority, which will be on the basis of employment.

  • BREEAM Excellent including an ecological and acoustic study.
  • Suitable for class C goods
  • Floorloading capacity mezzanine: 1,000 kg/m².
  • Indentation of the floor by 18 cm for chemical products.
  • Covered cycle areas with lighting and sockets.
  • Rainwater wells for water recovery.




Technical description

  • Air conditioning
  • Clear height : Unit 1 - 12,20 m
  • Clear height : Unit 2 A/B - 13,70 m
  • Concrete plinth height : 4,2 m
  • Electrical operating fence
  • Entrance for lorries : 4
  • False ceilings
  • Floor flatness : 3 mm / 2m
  • Floorloading capacity : 6 T/m²
  • High voltage cabin : 400 - 1.000 kVA
  • Hot air heaters - gas
  • Insulated roof : 10 cm PIR
Read more

Location and Transport

Located in Garocentre-Sud in La Louvière.Direct trimodal access (water, rail, road).

Charleroi Airport: 25 km
Brussels Airport : 62 km
Liège Airport : 98 km
E42 - Exit 20 - Houdeng : 3 km
E19 - Exit 20a - Houdeng : 4 km